broadway condos

The Broadway condo project is located in the Old Third Ward of Milwaukee. MD Construction was brought in the selectively remove walls throughout, completely gut the two bathrooms, and remove flooring throughout. We used special measures to keep noise and dust to a minimum to comply with the building manager and not disturb the surrounding tenants. The job was left in a safe and clean manner everyday and during debris removal the hallway was kept to a high standard. The Broadway Condo project took a total of 4 days to demolish and hall debris outside to a dumpster.